August 2015: World Coal
Written By: Phil Wowak, Senior Project Manager at ASGCO®
Phil Wowak, discusses two case studies that look at improving engineering transfer point – the first involving multiple load points and the second concerning a complex stacker reclaim system with a reversing belt.