While discussing the challenges with key employees, and doing a thorough analysis of the plant, we discovered some of the problems that were occurring, including; issues with conveyor belts not getting cleaned properly as well as tensioning systems on the primary belt cleaners locking up (or taking a set) and causing major material carry-back problems within the plant.

3-DEM-Biomass-Power-Plant-Chute-Problem-Solved

Top
Skip to content